Static snapshot. This site serves two different things: 1,988 data centres reported by OpenStreetMap contributors nationwide, and 13 sites Helios infers from Arizona parcel records, exported on July 29, 2026. The first is a map of what has been recorded; the second is an argued hypothesis with an evidence chain. This is a point-in-time export, not a live view. See meta.json or the methodology.

Cook County

County in IL · 39 data centres recorded in OpenStreetMap

Mapped facilities
39
on the map today
Floor area
0.42
km² across 26 buildings
Share of US load
436
MW, inferred upper bound
Water
0.95
million gal/day, inferred
7 of these 39 are not mapped as buildings, so no power figure is estimated for them. 1 is a campus boundary covering 0.20 km² of land, and 6 are sites mapped as under construction. The megawatt figure above divides a national total by building floor area, and the area of a land parcel is not floor area. A site still being built consumed none of the electricity that total measures. Both are counted here and left out of the estimate rather than folded into it, so this region's load is understated by however much those represent.

When these appeared on the map

observed, not surveyed
01530201720182019202120222023202420252026
Data centres recorded in OpenStreetMap at the end of each month. The hatched stretch is before 2017-01, when telecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.
9 of these 39 facilities do not appear in the curve. The chart counts facilities whose appearance was observed in OpenStreetMap's edit history; one mapped before 2012 has no creation edit to observe. The two numbers answer different questions — how many are on the map now, and how many were watched arriving — and neither is wrong.

What the grid here looks like

reported by OSM contributors
Substations
148
69 kV and above
Bulk substations
18
230 kV and above
Highest voltage
345
kV, present in this county
Generating capacity
1,295
MW across 36 plants

A facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 21 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.

Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.

Largest named mapped records

by mapped area
NameOperatorMapped asMapped area m²Share MWFirst mapped
Microsoft Data Center - Hoffman Estatesnot recordedCampus boundary195,586—2025-03-19
Digital Realty CH1Digital RealtyBuilding43,77145.32023-05-19
Digital Realty CH3Digital RealtyBuilding32,35133.52023-05-19
Microsoft - Azure DatacenterMicrosoftBuilding28,50029.52018-04-10
STACK Chicago CHI01Stack InfrastructureBuilding28,46329.42023-05-19
Digital Realty CH2Digital RealtyBuilding28,14729.12023-11-29
QTS ChicagoQuality Technology ServicesBuilding26,52227.42017-10-16
Aligned Data Centernot recordedBuilding24,12224.9not in edit history
Stream Chicago IIStreamBuilding19,79520.52023-11-29
Aligned Data Center - Chicago ORD-01AlignedBuilding18,07418.72025-06-18
Skybox Chicago ISkyboxBuilding16,21916.82023-11-29
Equinix Chicago CH3EquinixBuilding15,47816.02023-11-29
Stream Data CentersStream Data CentersUnder construction15,208—not in edit history
T5 Chicago II Data CenterT5 Data CentersBuilding15,16515.72023-11-29
Microsoft CHI12 Data CenterMicrosoftBuilding13,83614.3not in edit history
Microsoft CHI13 Data CenterMicrosoftUnder construction13,836—not in edit history
Stream Chicago IStreamBuilding13,53914.02023-11-29
Lakeside Technology Centernot recordedBuilding11,99912.42022-02-14
Prime Data Centersnot recordedBuilding11,67712.12026-02-14
EdgeConneX CHI01EdgeConneXBuilding11,16611.62023-05-19
Aligned Data Center - Chicago ORD-02AlignedBuilding10,70911.12025-06-18
Microsoft CHI11 Data CenterMicrosoftBuilding9,93610.32024-10-03
Iron Mountain Data & Record StorageIron MountainBuilding9,85110.22021-01-21
Prime Data Centersnot recordedUnder construction9,265—not in edit history
EdgeConneX Data CenterEdgeConneXUnder construction8,834—not in edit history
Digital Realty Chicago ORD12Digital RealtyBuilding8,3778.72023-05-19
EdgeConneX Data CenterEdgeConneXUnder construction7,775—not in edit history
EdgeConnex Data CenterEdgeConneXUnder construction7,526—not in edit history
EdgeConneX CHI02EdgeConneXBuilding6,0676.32023-11-29
CoreSite Chicago Data Center (CH2)CoreSiteBuilding5,7395.92020-09-15
Serverfarm CH1ServerfarmBuilding5,2425.42023-02-07
Digital Realty ORD11Digital RealtyBuilding8450.92024-10-30
NetralityNetralityPoint——2023-01-10
Digital Realty ORD10Digital RealtyPoint——2023-05-19
Centersquare Chicago Data Center - ORD1CentersquarePoint——2023-05-19
West Monroenot recordedPoint——2023-06-01
CoreSite Chicago Data Center (CH1)CoreSitePoint——2023-08-08
Equinix Chicago Data Center - CH1EquinixPoint——2025-03-24

“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.