Cook County
County in IL · 39 data centres recorded in OpenStreetMap
When these appeared on the map
observed, not surveyedtelecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.What the grid here looks like
reported by OSM contributorsA facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 21 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.
Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.
Largest named mapped records
by mapped area| Name | Operator | Mapped as | Mapped area m² | Share MW | First mapped |
|---|---|---|---|---|---|
| Microsoft Data Center - Hoffman Estates | not recorded | Campus boundary | 195,586 | — | 2025-03-19 |
| Digital Realty CH1 | Digital Realty | Building | 43,771 | 45.3 | 2023-05-19 |
| Digital Realty CH3 | Digital Realty | Building | 32,351 | 33.5 | 2023-05-19 |
| Microsoft - Azure Datacenter | Microsoft | Building | 28,500 | 29.5 | 2018-04-10 |
| STACK Chicago CHI01 | Stack Infrastructure | Building | 28,463 | 29.4 | 2023-05-19 |
| Digital Realty CH2 | Digital Realty | Building | 28,147 | 29.1 | 2023-11-29 |
| QTS Chicago | Quality Technology Services | Building | 26,522 | 27.4 | 2017-10-16 |
| Aligned Data Center | not recorded | Building | 24,122 | 24.9 | not in edit history |
| Stream Chicago II | Stream | Building | 19,795 | 20.5 | 2023-11-29 |
| Aligned Data Center - Chicago ORD-01 | Aligned | Building | 18,074 | 18.7 | 2025-06-18 |
| Skybox Chicago I | Skybox | Building | 16,219 | 16.8 | 2023-11-29 |
| Equinix Chicago CH3 | Equinix | Building | 15,478 | 16.0 | 2023-11-29 |
| Stream Data Centers | Stream Data Centers | Under construction | 15,208 | — | not in edit history |
| T5 Chicago II Data Center | T5 Data Centers | Building | 15,165 | 15.7 | 2023-11-29 |
| Microsoft CHI12 Data Center | Microsoft | Building | 13,836 | 14.3 | not in edit history |
| Microsoft CHI13 Data Center | Microsoft | Under construction | 13,836 | — | not in edit history |
| Stream Chicago I | Stream | Building | 13,539 | 14.0 | 2023-11-29 |
| Lakeside Technology Center | not recorded | Building | 11,999 | 12.4 | 2022-02-14 |
| Prime Data Centers | not recorded | Building | 11,677 | 12.1 | 2026-02-14 |
| EdgeConneX CHI01 | EdgeConneX | Building | 11,166 | 11.6 | 2023-05-19 |
| Aligned Data Center - Chicago ORD-02 | Aligned | Building | 10,709 | 11.1 | 2025-06-18 |
| Microsoft CHI11 Data Center | Microsoft | Building | 9,936 | 10.3 | 2024-10-03 |
| Iron Mountain Data & Record Storage | Iron Mountain | Building | 9,851 | 10.2 | 2021-01-21 |
| Prime Data Centers | not recorded | Under construction | 9,265 | — | not in edit history |
| EdgeConneX Data Center | EdgeConneX | Under construction | 8,834 | — | not in edit history |
| Digital Realty Chicago ORD12 | Digital Realty | Building | 8,377 | 8.7 | 2023-05-19 |
| EdgeConneX Data Center | EdgeConneX | Under construction | 7,775 | — | not in edit history |
| EdgeConnex Data Center | EdgeConneX | Under construction | 7,526 | — | not in edit history |
| EdgeConneX CHI02 | EdgeConneX | Building | 6,067 | 6.3 | 2023-11-29 |
| CoreSite Chicago Data Center (CH2) | CoreSite | Building | 5,739 | 5.9 | 2020-09-15 |
| Serverfarm CH1 | Serverfarm | Building | 5,242 | 5.4 | 2023-02-07 |
| Digital Realty ORD11 | Digital Realty | Building | 845 | 0.9 | 2024-10-30 |
| Netrality | Netrality | Point | — | — | 2023-01-10 |
| Digital Realty ORD10 | Digital Realty | Point | — | — | 2023-05-19 |
| Centersquare Chicago Data Center - ORD1 | Centersquare | Point | — | — | 2023-05-19 |
| West Monroe | not recorded | Point | — | — | 2023-06-01 |
| CoreSite Chicago Data Center (CH1) | CoreSite | Point | — | — | 2023-08-08 |
| Equinix Chicago Data Center - CH1 | Equinix | Point | — | — | 2025-03-24 |
“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.