Static snapshot. This site serves two different things: 1,988 data centres reported by OpenStreetMap contributors nationwide, and 13 sites Helios infers from Arizona parcel records, exported on July 29, 2026. The first is a map of what has been recorded; the second is an argued hypothesis with an evidence chain. This is a point-in-time export, not a live view. See meta.json or the methodology.

Ward County

County in TX · 2 data centres recorded in OpenStreetMap

Mapped facilities
2
on the map today
Floor area
0.01
km² across 2 buildings
Share of US load
11
MW, inferred upper bound
Water
0.02
million gal/day, inferred

When these appeared on the map

observed, not surveyed
02320252026202620262026202620262026
Data centres recorded in OpenStreetMap at the end of each month. The hatched stretch is before 2017-01, when telecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.

What the grid here looks like

reported by OSM contributors
Substations
32
69 kV and above
Bulk substations
2
230 kV and above
Highest voltage
345
kV, present in this county
Generating capacity
568
MW across 9 plants

A facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 5 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.

Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.