Static snapshot. This site serves two different things: 1,988 data centres reported by OpenStreetMap contributors nationwide, and 13 sites Helios infers from Arizona parcel records, exported on July 29, 2026. The first is a map of what has been recorded; the second is an argued hypothesis with an evidence chain. This is a point-in-time export, not a live view. See meta.json or the methodology.

Loudoun County

County in VA · 245 data centres recorded in OpenStreetMap

Mapped facilities
245
on the map today
Floor area
2.94
km² across 216 buildings
Share of US load
3,042
MW, inferred upper bound
Water
6.62
million gal/day, inferred
28 of these 245 are not mapped as buildings, so no power figure is estimated for them. 18 are campus boundaries covering 2.54 km² of land, and 10 are sites mapped as under construction. The megawatt figure above divides a national total by building floor area, and the area of a land parcel is not floor area. A site still being built consumed none of the electricity that total measures. Both are counted here and left out of the estimate rather than folded into it, so this region's load is understated by however much those represent.

When these appeared on the map

observed, not surveyed
0120239201620182019202020212023202420252026
Data centres recorded in OpenStreetMap at the end of each month. The hatched stretch is before 2017-01, when telecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.
6 of these 245 facilities do not appear in the curve. The chart counts facilities whose appearance was observed in OpenStreetMap's edit history; one mapped before 2012 has no creation edit to observe. The two numbers answer different questions — how many are on the map now, and how many were watched arriving — and neither is wrong.

What the grid here looks like

reported by OSM contributors
Substations
67
69 kV and above
Bulk substations
64
230 kV and above
Highest voltage
500
kV, present in this county
Generating capacity
778
MW across 1 plant

A facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation.

Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.

Largest named mapped records

by mapped area
NameOperatorMapped asMapped area m²Share MWFirst mapped
True North Data CentersTrue North Data SolutionsCampus boundary425,795—2025-05-16
Digital Loudoun Plazanot recordedCampus boundary265,693—2022-01-13
Google Data CenterGoogleCampus boundary199,105—2023-07-22
NTT Ashburn Campusnot recordedCampus boundary196,595—2024-12-19
Arcola Tech Parknot recordedCampus boundary161,230—2021-01-19
Amazon Fadeley IIInot recordedCampus boundary153,751—2023-04-12
CloudHQ Ashburn Campusnot recordedCampus boundary144,296—2024-12-19
MicrosoftMicrosoftCampus boundary137,061—2021-01-19
Stonewall Creek Business ParkGoogleCampus boundary120,008—2021-10-28
QTS Ashburn LockridgeQuality Technology ServicesCampus boundary115,619—2026-05-22
Amazon Web Services Datacenter ComplexAmazon Web ServicesCampus boundary101,083—2016-12-16
Amazon Web ServicesAmazon Web ServicesCampus boundary94,979—2016-12-16
QTS Ashburn-Shellhornnot recordedCampus boundary77,067—2024-12-19
Digital Loudoun Plazanot recordedCampus boundary63,782—2022-01-13
Digital Realty IAD39Digital RealtyBuilding51,02552.82019-07-30
CyrusOne NVA5CyrusOneBuilding47,09748.72016-12-16
CloudHQ LC1CloudHQBuilding46,37748.02020-04-20
CloudHQ LC4CloudHQBuilding44,94546.52025-04-28
Digital Realty ACC7Digital RealtyBuilding38,04239.42018-11-27
Digital Realty IAD44Digital RealtyBuilding37,11838.42024-09-24
Digital Realty IAD45Digital RealtyBuilding37,11638.42026-07-23
Digital Realty IAD41Digital RealtyBuilding36,88138.12020-04-19
Visa Operations Center EastVisaBuilding32,51533.62020-07-11
Yondr Allegro SouthYondrBuilding30,76931.82024-09-30
Digital Realty ACC9Digital RealtyBuilding30,58931.62018-11-27
Google Leesburg Building 3not recordedBuilding28,19629.22025-12-23
Digital Realty ACC5Digital RealtyBuilding27,76528.72016-12-16
Digital Realty ACC4Digital RealtyBuilding27,32828.32016-12-16
Google Arcola Building 2GoogleBuilding26,93227.92023-05-17
Digital Realty ACC10Digital RealtyBuilding26,85327.82019-07-31
CloudHQ LC8CloudHQUnder construction25,910—not in edit history
CloudHQ LC14CloudHQUnder construction25,907—not in edit history
Vantage VA3Vantage Data CentersBuilding25,30926.2not in edit history
CyrusOne Sterling IXCyrusOneBuilding24,98625.82021-10-06
CyrusOne NVA1/NVA2/NVA3CyrusOneBuilding24,67525.52016-12-17
CloudHQ LC2CloudHQBuilding23,33824.12020-04-20
Microsoft Leesburg Building 4not recordedBuilding22,95323.72023-07-11
Microsoft Leesburg Building 3not recordedBuilding22,54223.32023-07-11
Microsoft IAD11MicrosoftBuilding22,51523.32023-07-11
CloudHQ LC3CloudHQBuilding21,94222.72025-10-19

“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.