Static snapshot. This site serves two different things: 1,853 data centres reported by OpenStreetMap contributors nationwide, and 13 sites Helios infers from Arizona parcel records, exported on July 29, 2026. The first is a map of what has been recorded; the second is an argued hypothesis with an evidence chain. This is a point-in-time export, not a live view. See meta.json or the methodology.

AZ-CHANDLER-004

Chandler, Maricopa County, Arizona · enterprise data center Reported

0 No known developmentStage 7: Operational8 Expansion
Confidence (Id. / Stage)
51% / 44%
moderate
Site area
14.5
acres across 1 parcel
Evidence records
4
first signal 2025-10-30
Estimated load
17–70 MW
inferred from acreage — see the estimates panel
Summary. 1 parcel(s) totalling 14.5 acres near 2500 W FRYE RD, Chandler. Title of record is held by 2500 WEST FRYE ROAD OWNER LLC. Helios has not established which organization, if any, operates or will operate a facility here.

Evidence timeline

5 chronological entries
  1. 30 Oct 2025
    Shell entity ownershipInferred

    Title is held by 2500 WEST FRYE ROAD OWNER LLC, whose name shows single-purpose-entity characteristics (pass-through legal form (LLC)). This is a weak signal only: project-specific entities are routine in ordinary commercial real estate and imply no particular parent.

    OwnerName = 2500 WEST FRYE ROAD OWNER LLC
    Source: Maricopa County Assessor Parcel LayerView original evidenceRetrieved 2026-07-25sha256:77af6d6d43fe$.features[2].attributes.OwnerNameExtraction confidence 45%
  2. 30 Oct 2025
    Stage advanced to Operational

    Stage advanced from 0 (No known development) to 7 (Operational) at 44% confidence. Principal evidence: Assessor classifies property use as data centre; Backup-generator air permit; Single-purpose entity holds title.

    UnclassifiedOperationalDetected 271 days after the factConfidence at transition 44%
  3. 25 Jul 2026
    Dedicated substation proximityCalculatedStanding condition

    Unnamed substation tagged 69 kV lies 25 m from the site boundary, close enough for a dedicated connection to be practical. Proximity is a locational precondition, not evidence that this substation serves the site.

    name = None; operator = unknown; max_voltage_kv = 69.0
    Source: OpenStreetMap Power Infrastructure (Overpass API)View original evidenceRetrieved 2026-07-25sha256:b780b9bfc5c6OSM elementExtraction confidence 94%
  4. 28 Jul 2026
    Backup generator air permitExtractedStanding condition

    EPA ECHO lists CPUS WEST FRYE ROAD, LP as a Clean Air Act facility (NAICS 518210). Program text and/or hosting NAICS are consistent with backup generation at a data-processing site. Coordinates may be geocoded. Programs: SIP.

    CPUS WEST FRYE ROAD, LP; SIP
    Source: EPA ECHO Air Facility RecordsView original evidenceRetrieved 2026-07-25sha256:71c269ae37b2$.Results.Facilities[126]Extraction confidence 80%
  5. 28 Jul 2026
    Assessor data center classificationReportedStanding condition

    Maricopa County Assessor currently classifies this parcel's property use as DATA CENTERS (use code 1507).

    PropertyUseDescription = DATA CENTERS
    Source: Maricopa County Assessor Parcel LayerView original evidenceRetrieved 2026-07-25sha256:77af6d6d43fe$.features[2].attributes.PropertyUseDescriptionExtraction confidence 95%

Why Helios believes this

51% Moderate
Confidence
44%
moderate
Supporting weight
+34.7
3 contributions
Countervailing weight
0.0
0 contributions
Evidence diversity
3
distinct kinds across 4 records
+19.00
Assessor classifies property use as data centre
Maricopa County Assessor currently classifies this parcel's property use as DATA CENTERS (use code 1507).
base 20 × extraction confidence 0.95 × recency 1.00
+13.60
Backup-generator air permit
EPA ECHO lists CPUS WEST FRYE ROAD, LP as a Clean Air Act facility (NAICS 518210). Program text and/or hosting NAICS are consistent with backup generation at a data-processing site. Coordinates may be geocoded. Programs: SIP.
base 17 × extraction confidence 0.80 × recency 1.00
+2.09
Single-purpose entity holds title
Title is held by 2500 WEST FRYE ROAD OWNER LLC, whose name shows single-purpose-entity characteristics (pass-through legal form (LLC)). This is a weak signal only: project-specific entities are routine in ordinary commercial real estate and imply no particular parent.
base 6 × extraction confidence 0.45 × recency 0.77
+0.00
High-voltage substation in close proximity
Unnamed substation tagged 69 kV lies 25 m from the site boundary, close enough for a dedicated connection to be practical. Proximity is a locational precondition, not evidence that this substation serves the site.
base 0 × extraction confidence 0.94 × recency 1.00

Scored by helios-rule-based version 0.1.0 on 2026-07-28, using evidence available as of 2026-07-28. Weights are domain-reasoned starting points, not values fitted to outcomes; calibration is deferred until a historical backtest exists to calibrate against.

Location

Estimated demand

none of this is a filed figure
Power capacityInferred

34.8 MW

17.4plausible range69.6

Assembled acreage x assumed power density, adjusted for stage.

What this assumes

Power density is an industry assumption, not a property of this site. Helios does not know the building footprint, rack density or how much of the assembled land will be built on.

stage
7
total acres
14.496
MW per acre low
1
MW per acre high
4
MW per acre likely
2
stage density multiplier
1.2
Cooling waterInferred

417,600 GPD

41,760plausible range1,670,400

Estimated power x assumed cooling water intensity.

What this assumes

Cooling type is not recorded in any source Helios ingests. A closed-loop or air-cooled design approaches zero water use; evaporative cooling can exceed a gallon per kWh. The band is wide because the practice is.

gal per kwh low
0.1
gal per kwh high
1
gal per kwh likely
0.5

Operator and ownership

Operator not established
2500 WEST FRYE ROAD OWNER LLCLLCPossible single-purpose entity
  • pass-through legal form (LLC)

Helios records the entity of record only. Shell-company indicators are flags for human review and do not constitute an attribution to any parent.

Parcels

APNAddressAcresDeed
303-24-019A2500 W FRYE RD14.502025-10-30

Infrastructure dependencies

Unnamed substationInferredLikely dedicated
25 m away · 69 kV · match confidence 94%
Unnamed substationInferredLikely dedicated
293 m away · 69 kV · match confidence 86%
Unnamed substationInferredLikely dedicated
394 m away · match confidence 83%
Unnamed substationInferredLikely dedicated
511 m away · 69 kV · match confidence 80%
Miller SubstationInferredLikely dedicated
908 m away · 69 kV · Salt River Project · match confidence 68%
SRP Knox - Henshaw PowerlinesInferred
1018 m away · 230 kV · SRP · match confidence 25%

5 further dependencies not shown.

Dependencies are inferred from spatial proximity. A nearby substation makes a connection practical; it is not evidence that one exists.

Attribution

  • Parcel data courtesy of Maricopa County Assessor / Maricopa County GIS.
  • Power infrastructure data (c) OpenStreetMap contributors, ODbL.