Washington County
County in OR · 36 data centres recorded in OpenStreetMap
When these appeared on the map
observed, not surveyedtelecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.What the grid here looks like
reported by OSM contributorsA facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 2 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.
Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.
Largest named mapped records
by mapped area| Name | Operator | Mapped as | Mapped area m² | Share MW | First mapped |
|---|---|---|---|---|---|
| Flexential Portland - Hillsboro 3 | Flexential | Building | 31,334 | 34.3 | 2021-03-23 |
| Digital Realty PDX11 Data Center | Digital Realty | Building | 26,742 | 29.3 | 2023-03-13 |
| Digital Realty PDX11 Data Center | Digital Realty | Building | 26,297 | 28.8 | 2021-03-21 |
| NTT RagingWire DC - Hillsboro | NTT | Building | 24,186 | 26.5 | 2021-03-23 |
| QTS Data Center - Hillsboro 3 | Quality Technology Services | Campus boundary | 20,060 | — | 2026-01-07 |
| Stack Infrastructure - POR02 | Stack Infrastructure | Building | 19,994 | 21.9 | 2021-02-12 |
| Flexential Portland - Hillsboro 2 | Flexential | Building | 19,905 | 21.8 | 2021-03-22 |
| NTT RagingWire DC - Hillsboro | NTT | Building | 19,052 | 20.9 | 2026-04-21 |
| Flexential Portland - Hillsboro 5 | Flexential | Building | 16,781 | 18.4 | 2023-02-20 |
| QTS Data Center - Hillsboro 3 | Quality Technology Services | Campus boundary | 16,383 | — | 2026-01-07 |
| QTS Data Center - Hillsboro 2 | Quality Technology Services | Building | 16,164 | 17.7 | 2023-10-02 |
| QTS Data Center - Hillsboro 2 | Quality Technology Services | Building | 16,044 | 17.6 | 2022-09-26 |
| QTS Data Center - Hillsboro 2 | Quality Technology Services | Building | 15,941 | 17.5 | 2023-08-22 |
| QTS Data Center - Hillsboro 2 | Quality Technology Services | Building | 15,693 | 17.2 | 2023-11-14 |
| QTS Data Center - Hillsboro 1 | Quality Technology Services | Building | 14,665 | 16.1 | 2021-03-23 |
| Aligned DC - PDX-01 | Aligned Data Centers | Building | 14,439 | 15.8 | 2022-11-17 |
| Crane DC - Portland | Crane Data Centers Inc. | Campus boundary | 11,083 | — | 2026-04-21 |
| Adobe Data Center | not recorded | Building | 10,670 | 11.7 | 2021-03-23 |
| Stack Infrastructure - POR03 | Stack Infrastructure | Under construction | 9,099 | — | 2026-04-21 |
| Flexential Portland - Hillsboro 4 | Flexential | Building | 9,061 | 9.9 | 2021-03-23 |
| Stack Infrastructure - POR03 | Stack Infrastructure | Building | 8,734 | 9.6 | 2021-03-23 |
| Stack Infrastructure - POR03 | Stack Infrastructure | Building | 8,666 | 9.5 | 2024-01-26 |
| Stack Infrastructure - POR03 | Stack Infrastructure | Building | 8,463 | 9.3 | 2024-01-26 |
| Stack Infrastructure - POR01 | Stack Infrastructure | Building | 8,363 | 9.2 | 2026-04-21 |
| EdgeConneX - Portland | EdgeConneX | Building | 7,848 | 8.6 | 2024-07-27 |
| Digital Realty PDX10 Data Center | Digital Realty | Building | 6,392 | 7.0 | 2021-02-12 |
| Oracle | not recorded | Building | 6,182 | 6.8 | 2026-04-21 |
| Verizon Hillsboro (Tanasbourne) Data Center | Verizon Business | Building | 5,695 | 6.2 | 2026-04-20 |
| Flexential Portland - Hillsboro 1 | Flexential | Building | 4,096 | 4.5 | 2021-02-12 |
| Flexential Portland - Hillsboro 1 | Flexential | Building | 3,832 | 4.2 | 2021-02-17 |
| Data Center | Oregon Health & Science University | Building | 2,350 | 2.6 | 2023-01-22 |
| TGN Hillsboro | Tata Communications | Building | 2,227 | 2.4 | 2026-04-20 |
| Flexential Portland - Hillsboro 4 Expansion | Flexential | Building | 1,862 | 2.0 | 2025-05-30 |
| Digital Fortress - Portland 2 | Digital Fortress, Inc | Point | — | — | 2026-04-21 |
| Digital Fortress - Portland 3 | Digital Fortress, Inc | Point | — | — | 2026-04-21 |
“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.