MN
State · 18 data centres recorded in OpenStreetMap
When these appeared on the map
observed, not surveyedtelecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.What the grid here looks like
reported by OSM contributorsA facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 188 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.
Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.
Largest named mapped records
by mapped area| Name | Operator | Mapped as | Mapped area m² | Share MW | First mapped |
|---|---|---|---|---|---|
| Meta Rosemount Data Center | Meta | Under construction | 960,113 | — | 2025-11-29 |
| Project Skyway | Campus boundary | 744,894 | — | before 2012 | |
| UHG Data Center | not recorded | Building | 28,092 | 30.8 | before 2012 |
| Flexential Minneapolis - Chaska | Flexential | Building | 12,589 | 13.8 | 2024-08-15 |
| Lightedge Data Center | not recorded | Building | 11,502 | 12.6 | before 2012 |
| DataBank | not recorded | Building | 10,651 | 11.7 | 2024-12-17 |
| H5 Minneapolis | H5 | Building | 10,052 | 11.0 | 2025-12-23 |
| Minnesota Gateway Data Center | not recorded | Building | 8,147 | 8.9 | 2023-03-20 |
| Encompass Minneapolis Facility | Encompass | Building | 6,884 | 7.5 | 2025-06-04 |
| Verizon - Bloomington Network | Verizon | Building | 6,360 | 7.0 | 2026-04-11 |
| StreamData Center | not recorded | Building | 5,994 | 6.6 | before 2012 |
| Epic / Mayo Data Center | not recorded | Building | 4,489 | 4.9 | 2022-09-08 |
| Ark Duluth Data Center | not recorded | Building | 2,524 | 2.8 | 2024-08-11 |
| Advanced Operations Center | University of Minnesota | Building | 1,861 | 2.0 | before 2012 |
| Lumen Minneapolis 3 | Lumen Technologies | Building | 1,245 | 1.4 | 2026-06-19 |
“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.