Static snapshot. This site serves two different things: 1,853 data centres reported by OpenStreetMap contributors nationwide, and 13 sites Helios infers from Arizona parcel records, exported on July 29, 2026. The first is a map of what has been recorded; the second is an argued hypothesis with an evidence chain. This is a point-in-time export, not a live view. See meta.json or the methodology.

MO

State · 17 data centres recorded in OpenStreetMap

Mapped facilities
17
on the map today
Floor area
0.16
km² across 14 buildings
Share of US load
172
MW, inferred upper bound
Water
0.37
million gal/day, inferred
1 of these 17 are not mapped as buildings, so no power figure is estimated for them. 1 is a campus boundary covering 1.26 km² of land. The megawatt figure above divides a national total by building floor area, and the area of a land parcel is not floor area. A site still being built consumed none of the electricity that total measures. Both are counted here and left out of the estimate rather than folded into it, so this region's load is understated by however much those represents.

When these appeared on the map

observed, not surveyed
0917202220232023202420242025202520262026
Data centres recorded in OpenStreetMap at the end of each month. The hatched stretch is before 2017-01, when telecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.

What the grid here looks like

reported by OSM contributors
Substations
1,097
69 kV and above
Bulk substations
63
230 kV and above
Highest voltage
500
kV, present in this state
Generating capacity
22,040
MW across 136 plants

A facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 29 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.

Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.

Largest named mapped records

by mapped area
NameOperatorMapped asMapped area m²Share MWFirst mapped
Meta Kansas City Data CenterMetaCampus boundary1,255,7532025-08-31
Meta Data CenterMetaBuilding57,22262.72023-06-21
Black Rock Financial Managementnot recordedBuilding7,4358.22022-07-02
Carfaxnot recordedBuilding3,6694.02024-10-03
Genome Data CenterWashington University in St. LouisBuilding2,2782.52025-11-28
TierPointnot recordedBuilding2,2332.52025-01-06
Netrality Data Centersnot recordedBuilding2,1462.42022-10-31
CenturyLinknot recordedBuilding1330.12025-03-25
Netrality Data Centersnot recordedPoint2022-07-31

“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.