Static snapshot. This site serves two different things: 1,853 data centres reported by OpenStreetMap contributors nationwide, and 13 sites Helios infers from Arizona parcel records, exported on July 29, 2026. The first is a map of what has been recorded; the second is an argued hypothesis with an evidence chain. This is a point-in-time export, not a live view. See meta.json or the methodology.

GA

State · 39 data centres recorded in OpenStreetMap

Mapped facilities
39
on the map today
Floor area
0.66
km² across 29 buildings
Share of US load
723
MW, inferred upper bound
Water
1.57
million gal/day, inferred
7 of these 39 are not mapped as buildings, so no power figure is estimated for them. 7 are campus boundaries covering 1.45 km² of land. The megawatt figure above divides a national total by building floor area, and the area of a land parcel is not floor area. A site still being built consumed none of the electricity that total measures. Both are counted here and left out of the estimate rather than folded into it, so this region's load is understated by however much those represent.

When these appeared on the map

observed, not surveyed
02039202020212022202220232024202520252026
Data centres recorded in OpenStreetMap at the end of each month. The hatched stretch is before 2017-01, when telecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.

What the grid here looks like

reported by OSM contributors
Substations
1,841
69 kV and above
Bulk substations
441
230 kV and above
Highest voltage
500
kV, present in this state
Generating capacity
39,650
MW across 356 plants

A facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 92 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.

Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.

Largest named mapped records

by mapped area
NameOperatorMapped asMapped area m²Share MWFirst mapped
Meta Stanton Springs Data CenterMetaCampus boundary839,1382022-04-24
Google Datacenter - Douglas CountyGoogleCampus boundary242,3382021-12-27
QTS SuwaneeQuality Technology ServicesCampus boundary134,8992023-09-12
Hewlett-Packardnot recordedCampus boundary120,2452022-02-24
QTS Atlanta Data Center 1Quality Technology ServicesBuilding66,86673.32022-09-03
Ascent - Atlanta Data CenterAscentCampus boundary55,3072022-02-24
DLI ONEDLI ONECampus boundary39,0932023-11-24
QTS Suwanee Data Center 2Quality Technology ServicesBuilding33,48036.72023-09-12
QTSQuality Technology ServicesBuilding31,64234.72026-01-29
QTSQuality Technology ServicesBuilding30,95033.92026-05-08
Digital Realty Atlanta ATL11Digital RealtyBuilding29,12731.92021-08-20
Flexential Atlanta - Douglasville 2FlexentialBuilding28,90931.72024-08-15
QTS Suwanee Data Center 1Quality Technology ServicesBuilding28,84531.62023-09-12
QTS Atlanta Data Center 2Quality Technology ServicesBuilding26,32028.92021-11-30
Centersquare Atlanta ATL1CentersquareBuilding23,05725.32021-08-20
QTSQuality Technology ServicesBuilding21,11123.12026-01-29
Flexential Atlanta - Douglasville 1FlexentialBuilding19,87321.82024-08-15
QTSQuality Technology ServicesBuilding19,16721.02026-05-08
Secure Data Centernot recordedBuilding17,09518.72022-01-29
UPS Data Centernot recordedBuilding16,13717.72024-05-13
Switch Data CenterSwitchBuilding15,93317.52021-08-20
Digital Realty Data CenterDigital RealtyBuilding11,96413.12022-03-04
Cox Data Centernot recordedBuilding11,87813.02024-05-02
Strategic Dataspherenot recordedBuilding11,84413.02026-02-01
Mapletree Industrialnot recordedBuilding10,85511.92026-02-01
T5 Data Centernot recordedBuilding9,20010.12022-02-24
Flexential Atlanta - Alpharetta Data CenterFlexentialBuilding7,0717.82023-04-08
CoreSite AT2 - Marietta Data CenterCoreSiteBuilding6,9517.62022-05-01
Flexential Atlanta - NorcrossFlexentialBuilding3,0023.32023-04-08
CenturyLinknot recordedBuilding2,1412.42022-03-04
Google FiberGooglePoint2022-04-12
Atlanta ATL13Digital RealtyPoint2024-11-11
CoreSite AT1CoreSitePoint2024-11-11

“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.