Static snapshot. This site serves two different things: 1,853 data centres reported by OpenStreetMap contributors nationwide, and 13 sites Helios infers from Arizona parcel records, exported on July 29, 2026. The first is a map of what has been recorded; the second is an argued hypothesis with an evidence chain. This is a point-in-time export, not a live view. See meta.json or the methodology.

King County

County in WA · 15 data centres recorded in OpenStreetMap

Mapped facilities
15
on the map today
Floor area
0.09
km² across 15 buildings
Share of US load
99
MW, inferred upper bound
Water
0.22
million gal/day, inferred

When these appeared on the map

observed, not surveyed
0815tag not yet in use201520162018201920202021202320242024
Data centres recorded in OpenStreetMap at the end of each month. The hatched stretch is before 2017-01, when telecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.

What the grid here looks like

reported by OSM contributors
Substations
33
69 kV and above
Bulk substations
13
230 kV and above
Highest voltage
500
kV, present in this county
Generating capacity
118
MW across 12 plants

A facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 6 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.

Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.

Largest named mapped records

by mapped area
NameOperatorMapped asMapped area m²Share MWFirst mapped
Intergate Seattle East Building 3SabeyBuilding18,89520.72016-12-17
Intergate Seattle East Building 5SabeyBuilding18,59220.42016-12-17
Intergate Seattle East Building 4Digital RealtyBuilding10,85411.92016-12-17
Intergate Seattle East Building 2not recordedBuilding9,97010.92016-12-17
Intergate Seattle East Building 1SabeyBuilding9,09210.02016-12-17
The Seattle TimesH5 Data CentersBuilding4,5145.02021-03-03
KOMO Plaza Eastnot recordedBuilding4,2504.72021-03-03
Intergate Seattle West Building ASabeyBuilding3,5813.92016-12-17
CTI Biopharmanot recordedBuilding1,9142.12023-12-11
KOMO Plaza Westnot recordedBuilding1,8802.12021-03-03
Intergate Seattle West Building CSabeyBuilding1,8392.02016-12-17
Intergate Seattle West Building BSabeyBuilding1,7781.92016-12-17
Westin BuildingDigital RealtyBuilding1,2191.32016-12-17
Equinix SE3 Data CenterEquinixBuilding1,1681.32015-07-11

“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.