Static snapshot. This site serves two different things: 1,853 data centres reported by OpenStreetMap contributors nationwide, and 13 sites Helios infers from Arizona parcel records, exported on July 29, 2026. The first is a map of what has been recorded; the second is an argued hypothesis with an evidence chain. This is a point-in-time export, not a live view. See meta.json or the methodology.

WA

State · 80 data centres recorded in OpenStreetMap

Mapped facilities
80
on the map today
Floor area
0.65
km² across 67 buildings
Share of US load
712
MW, inferred upper bound
Water
1.55
million gal/day, inferred
13 of these 80 are not mapped as buildings, so no power figure is estimated for them. 12 are campus boundaries covering 3.12 km² of land, and 1 is a site mapped as under construction. The megawatt figure above divides a national total by building floor area, and the area of a land parcel is not floor area. A site still being built consumed none of the electricity that total measures. Both are counted here and left out of the estimate rather than folded into it, so this region's load is understated by however much those represent.

When these appeared on the map

observed, not surveyed
04182tag not yet in use201520162018201920212022202420252026
Data centres recorded in OpenStreetMap at the end of each month. The hatched stretch is before 2017-01, when telecom=data_center was not yet in common use — the near-zero readings there describe the tag, not the country. This is a count of what has been mapped, and OpenStreetMap carries no construction dates.
2 of these 80 facilities do not appear in the curve. The chart counts facilities whose appearance was observed in OpenStreetMap's edit history; one mapped before 2012 has no creation edit to observe. The two numbers answer different questions — how many are on the map now, and how many were watched arriving — and neither is wrong.

What the grid here looks like

reported by OSM contributors
Substations
880
69 kV and above
Bulk substations
158
230 kV and above
Highest voltage
500
kV, present in this state
Generating capacity
34,693
MW across 147 plants

A facility drawing hundreds of megawatts connects at bulk transmission voltage, so the second figure matters more than the first: forty 69 kV yards are not a substitute for one 500 kV substation. 32 of the plants here carry no capacity tag, so the megawatt total is a floor rather than the region's output.

Proximity is not connection. Nothing here shows that any facility has contracted power from any of these substations. That gets settled in interconnection filings Helios cannot read, and in several regions those queues now run for years. A county showing no substations may have none mapped rather than none standing.

Largest named mapped records

by mapped area
NameOperatorMapped asMapped area m²Share MWFirst mapped
Microsoft MWH Data CenterMicrosoftCampus boundary778,6212019-07-23
Intergate Quincy Data CenterSabey Data CentersCampus boundary401,2032016-12-17
Microsoft Columbia Data Centernot recordedCampus boundary287,8172019-07-23
NTTData Data Centernot recordedCampus boundary285,0792025-03-19
Vantage Quincy CampusVantageCampus boundary264,4862016-12-17
Intergate Columbianot recordedCampus boundary257,4432019-07-23
H5 Data CenterIntuitCampus boundary250,8952016-12-17
Yahoo Data CenterYahooCampus boundary201,7202016-12-17
Centerisnot recordedCampus boundary190,6832023-11-24
CyrusOne QuincyCyrusOneCampus boundary165,3272024-12-19
ActapioActapioCampus boundary33,6792022-06-20
Intergate Columbia ASabey Data CentersBuilding24,37626.72016-12-17
Vantage WA13not recordedBuilding23,41425.72024-12-19
Microsoft EAT02MicrosoftBuilding22,86625.12022-06-20
Microsoft EAT03MicrosoftBuilding21,87124.02023-05-16
Microsoft EAT04MicrosoftUnder construction21,8172023-05-16
Intergate Seattle East Building 3SabeyBuilding18,89520.72016-12-17
Intergate Seattle East Building 5SabeyBuilding18,59220.42016-12-17
Intergate Columbia BSabey Data CentersBuilding17,92019.62016-12-17
MicrosoftMicrosoftBuilding15,10716.62019-07-25
MicrosoftMicrosoftBuilding14,60416.02019-07-25
MicrosoftMicrosoftBuilding14,05115.42019-07-25
MicrosoftMicrosoftBuilding13,74215.12019-07-25
Vantage WA11not recordedBuilding13,69715.02019-07-23
MicrosoftMicrosoftBuilding13,32614.62019-07-25
MicrosoftMicrosoftBuilding13,32614.62025-09-15
Intergate Columbia DSabey Data CentersBuilding12,54413.82022-06-20
Vantage WA12not recordedBuilding11,58512.72019-07-23
Intergate Seattle East Building 4Digital RealtyBuilding10,85411.92016-12-17
MicrosoftMicrosoftBuilding10,77711.82019-07-25
Centeris SH1 Colocationnot recordedBuilding10,75711.82023-11-24
MicrosoftMicrosoftBuilding10,40811.42019-07-25
Intergate Seattle East Building 2not recordedBuilding9,97010.92016-12-17
Centersquare Lynnwood SE1CentersquareBuilding9,70510.62022-01-04
NTT Data QuincyNTTBuilding9,26810.22019-07-25
Intergate Seattle East Building 1SabeyBuilding9,09210.02016-12-17
Centeris SH2 Build-to-Suitnot recordedBuilding8,6909.52023-11-24
The Seattle TimesH5 Data CentersBuilding4,5145.02021-03-03
KOMO Plaza Eastnot recordedBuilding4,2504.72021-03-03
Intergate Seattle West Building ASabeyBuilding3,5813.92016-12-17

“First mapped” is when OpenStreetMap recorded the facility, not when it was built — OpenStreetMap carries no construction dates. Mapped area means a building floor plate, campus boundary, or construction polygon according to the “Mapped as” column; those quantities are never added together. The megawatt column appears only for buildings and is their floor-area share of a reported national total, not a measurement.